A+ Charter Schools Design-Build Project

April 21, 2023

A+ Charter School, Texas

The A+ Charter Schools Design-Build Project

By Madeline Urquhart

A+ Charter Schools is located in Dallas, TX. The project began with a Preliminary Energy Assessment of all 6 schools within the A+ Charter District, with the goal to identify Facility Improvement Measures (FIM) or Energy Conservation Measures (ECM) and prioritize each based on an agreed-upon level of urgency. Veregy was able to provide options consisting of assessments, retrofits, or complete replacement with harmony of A+ Charters short and long-term goals. 

During the audit, we were able to identify the needs in each building for general contracting work related to a host of capital improvements, consisting of mainly retrofit, and in some cases full demolition. This $9M Design-Build project will begin construction in 2023. 

Benefits of the project for A+ Charter Schools includes:

  • Financial savings through decreased operating and energy expenses
  • Optimization of the indoor environment for increased comfort and productivity
  • Avoidance of risk associated with failure of older equipment
  • Greater control and flexibility over the building systems
  • Rebate money available to reduce capital investment
  • Incentive funds available for capital improvements related to COVID Virus
  • Increased reliability of mechanical systems
  • Reduction of deferred maintenance
  • Positive public relations
  • Capital cost avoidance for replaced equipment

Potential Scope of Work (rolling out in multiple phases) includes:

  • Abatement
  • Bathroom Upgrades
  • Building Envelope
  • Carpentry
  • Ceiling Replacement
  • Drainage & Sewer System Assessment and Repairs
  • Electrical Infrastructure Upgrades
  • Energy Conservation
  • Exterior Walkways & Covers
  • Floor Tile/Carpet Replacement/Repairs
  • Hazardous Conditions
  • Health Life Safety Conditions
  • Healthy Building Improvements
  • HVAC Controls & Upgrades
  • Integrated Intercom /Clock Systems
  • Lighting Upgrades and Controls
  • Low Voltage Cabling Systems Upgrades
  • Parking Lot Repairs
  • Plumbing Upgrades
  • Portable Buildings Upgrades or Replacement
  • Roof Systems Assessment
  • New Facility Construction
  • Structural Conditions Assessment

If you have any questions regarding the project, please contact Madeline Urquhart at murquhart@veregy.com. 

    RELATED CONTENT

    How to Build a Customized Decarbonization Roadmap

    Decarbonization is no longer a future-facing ambition, it’s a present-day planning challenge that demands clear priorities, measurable savings, and a roadmap tailored to each organization’s financial realities. In this article, Veregy outlines how businesses, school districts, and public entities can move from broad sustainability goals to a phased, executable strategy by starting with a data-driven baseline, aligning with community needs, and sequencing efficiency, electrification, and renewables in the right order.

    read more

    The On-Ramp to Decarbonization for Local Government

    Local governments don’t have a technology problem with decarbonization, they have a funding and execution challenge. This thought leadership article explains how Energy Savings Performance Contracting (ESPC) helps public agencies modernize infrastructure, reduce emissions, and improve resilience by using energy savings to fund upgrades while minimizing financial risk.

    read more